
GreenBy successfully delivered a complete end-to-end FABLAB implementation — from planning and procurement to infrastructure deployment, equipment installation, commissioning, training, and long-term operational support.
Execution Phases
Equipment Categories
Operational Readiness
Support Coverage

Project Overview
GreenBy was engaged to support the end-to-end execution of a modern FABLAB designed to advance innovation, digital manufacturing, research, skills development and product prototyping. The project demanded full technical coordination across infrastructure, procurement, installation, software, training, documentation, commissioning and post-deployment support.
Through structured project management and multidisciplinary execution, GreenBy transformed the FABLAB vision into a fully operational innovation facility.
The Challenge
From power and connectivity to machine installation, user workflows, safety standards and operational handover, every component had to work together as one.
Aligning multiple equipment suppliers, contractors and specialists into one synchronised delivery plan.
Sourcing, tracking and clearing specialised laboratory equipment across international supply chains.
Power, connectivity, servers and structured cabling engineered to support advanced fabrication.
Precise positioning, configuration and calibration of demanding digital fabrication machines.
Safety standards, user workflows and handover so the facility was ready to run from day one.
Our Process

Stakeholder engagement, site assessment and detailed technical planning defined the lab layout, equipment, ICT architecture, power needs and commissioning framework.

Coordinated supply and delivery of laboratory equipment, software, computers, networking and safety tools — each item reviewed, tracked and inspected.

Structured cabling, fibre backbone, network equipment, wireless connectivity, servers, workstations and power routing established the technical foundation.

Digital fabrication machines were positioned, configured, calibrated and tested to support design, prototyping, electronics, fabrication and production.

Design software, equipment control systems, user access workflows and operational tools integrated into one smooth, usable environment.

Structured testing confirmed equipment, networks, software and processes worked as intended — with documentation, demonstrations and client validation.

Capacity-building covered machine operation, safety, troubleshooting, digital workflows, maintenance and laboratory management for long-term sustainability.

A fully operational FABLAB — ready for training, research, innovation and production — officially commissioned and handed over.
Infrastructure
Before installation, GreenBy deployed the structured cabling, fibre backbone, network equipment, servers, workstations and power routing needed for advanced fabrication.
Resilient, high-throughput LAN architecture.
Central server systems for storage and control.
Structured power routing and equipment readiness.
Fibre backbone for high-speed connectivity.
Structured cabling and full wireless coverage.
Configured design and production workstations.
Safety standards built into every workflow.
Design, control and operational software stack.

Equipment Installation
CNC Router
Laser Cutter
3D Printing
Electronics Lab
Robotics
Woodworking
Metal FabricationSystems Integration

Training & Knowledge Transfer
GreenBy delivered capacity-building across machine operation, safety, troubleshooting, digital workflows, maintenance and laboratory management — so the client team can run the facility with confidence.
The Outcome
Fully deployed and commissioned FABLAB facility, ready for launch.
Advanced fabrication equipment installed, configured and calibrated.
ICT, software and operational systems working as one ecosystem.
Structured technical training and knowledge transfer delivered.
Testing, documentation and formal handover completed.
Support established for continued, sustainable operations.
Project Gallery
Click any image to explore the full gallery.
Launch Video
The final launch video captures the completed laboratory, project stakeholders, facility walkthrough, equipment demonstrations and the official commissioning of the FABLAB.



“GreenBy demonstrated exceptional professionalism in coordinating one of the most technically demanding innovation infrastructure projects.”
Project Stakeholder
FABLAB Programme
GreenBy’s Contribution
Whether you’re planning a FABLAB, Makerspace, Innovation Hub, Research Centre or Smart Laboratory, GreenBy delivers world-class implementation from concept to commissioning.